- Timing path that is designed to take half clock cycle (both of the clock edges) for the data to propagate from the start point to the end point.
- Both the Startpoint and Endpoint Flops should be clocked by the same Clock.
- No Need to specify the launch edge and capture edge in SDC, since the tool can identify it from the netlist.
can you tell me the equation for HOLD??
ReplyDeleteTp/2 + Tcq + Tcomb > Thold2 + Tskew
Deletein which situation we get half cycle path?
ReplyDelete