Multi-Cycle Path:
- Timing path that is designed to take more
than one clock cycle for the data to propagate from start point to the end
point.
- Both the Startpoint and Endpoint Flops should be clocked by
the same Clock.
- Need to specify the launch edge and
capture edge in SDC
No comments:
Post a Comment