Tuesday, 17 January 2017

Single Cycle Path:

  • With in one clock cycle the timing path that is designed for the data has to propagate from Startpoing to Endpoint.
  • Both the Startpoint and Endpoint Flops should be clocked by the same Clock.
  • Generally Tools will consider all the timing paths as single cycle paths.




No comments:

Post a Comment